LAKE GROVE PRESBYTERIAN CHURCH
SANCTUARY ENHANCEMENT PROJECT
TOWN HALL MEETING – AUGUST 6, 2006
9:30 a.m. – Church Library
SEP team members present: Dave Hercher, Neil Cox, Richard Shavey, Pat Creighton, Barbara Mount, and Shirley Bankston.
11 guests were present. The following are suggestions from the whole group.
Lighting:
- Replace the fixtures – can’t see the hymnals – can see OK
Sound:
- We have a top of the line sound system, but need a professional operator with knowledge of the equipment.
- Can hear Pastor Bob fine
- Softer speaking people need more amplification or should be better informed on how to speak.
- Consider a sound booth
Seating:
- Consider more space for handicap seating
- Flexible seating for better wheelchair access
- More flexible seating
- I.e. Half pews – half adjustable chair seating (refer to St. Andrew’s remodeling project now underway)
- CSA – Congregational seating assignment!
Chancel Area:
- Handrail for chancel steps for folks to hold onto while holding communion elements.
- Relocate organ to bell choir space.
Space overall:
- More open feeling – more light – more freewheeling – flexibility
- Bring up to date:
- Lighten up
- Panel drop ceiling
- Like the natural low light. Gives sense of calmness and peace.
- Love the high ceiling – gives a soaring sense
- Increase size of doors to the gathering area for easier in and out after services and access for wheelchairs
- Add glass. Increase natural light.
- Stained glass – replace and expand
- Walls: lighten to pew color
- No strong feelings
- Like the dark walls
- Like the ceiling as it is
- Clean up pews
- New cushions
- Pews are too close together.
- Purchase chairs with arm rests and cushions for back support.
- Loft in back of sanctuary
- Relocate organ pipes to access more seating for choir
- Add choir seating in bell choir area
- Flooring:
- Tiles ripped and torn
- encapsulate and cover asbestos
- wood floor throughout - from chancel to back of sanctuary
- Consider removing flooring & some foundations to increase ductwork capacity for heat and air conditioning.
- New carpeting for center and possibly side aisles
- Not large enough
- Dress it up
- Don’t do anything to the Sanctuary
- Balance cost of renovation with mission work
- Keep it simple
- Improve lighting, redo flooring and sound system
Fellowship Hall:
- Need better sound system
- Need more cushioned chairs with arm rests.
- Pedestrian flow:
- Form a subcommittee to study pedestrian flow into and out of the sanctuary.
|